Temporary Builders Supply Blacktown
Metered, protected site power connected to the Endeavour Energy network from the first day on site.
Every Blacktown build needs power from the first day: knockdown rebuilds in the established suburbs, new homes on fresh lots in Schofields and Marsden Park, and granny flats out the back. Leads from the neighbour’s house and generators are slow and unsafe. A temporary builders supply gives the site a proper metered connection with safety switches and outlets for the trades.
Two kinds of site
Established streets. Blacktown, Seven Hills, Lalor Park, Mount Druitt and the like usually have overhead mains. The temporary pole stands near the front boundary and takes an overhead service from the nearest street pole.
New estates. In Schofields, Riverstone’s new estates, Marsden Park and other growth areas, the street mains are underground. A site board connects to the pit at your boundary.
Either way, we place the supply where it won’t block excavators, concrete trucks, pumps or scaffold.
The right order
- Disconnect the old house permanently (rebuilds)
- Install site power the same visit
- Build on site power
- Connect the permanent supply to the new meter board
- Remove the site supply
Our power disconnection and reconnection page covers step 1. If the finished home will be three phase, lodge the three phase power application early.
What we need
- Site address and builder contact
- A site plan or sketch
- Single or three phase
- Start date
- A retailer account for the site
Granny flats
Granny flat builders sometimes run off the main house for small jobs, but a full build is safer on its own temporary supply. At the end, the flat is usually connected through the main house’s board, which may need a consumer mains upgrade.
Common delays
No retailer account, so no meter. The pole placed where the slab or driveway goes. Single phase requested when the build needs three. Demolition booked before disconnection. We run through each at the start.
Moving it
If the supply needs to move when the driveway is poured, we relocate it with a short disconnection.
At the end
Once the new meter board is in and certified by your electrician, we connect the permanent supply, test and certify, and remove the temporary supply.
Safety on site
Temporary supplies get bumped by machinery, rained on and splashed with concrete. We install them to handle that, with the safety switches and protection the rules require. If an overhead line runs near the work area, we can advise on keeping cranes, concrete pumps and scaffold clear of it.
Weather and site conditions
Western Sydney summers are hot and storms arrive quickly. Site boards are weatherproof, but if a storm damages the temporary supply or water gets in, keep clear and call us rather than resetting anything.
Project builders
Many Blacktown homes are built by volume builders with tight programs. We work to their schedules, lodge applications as soon as we have the lot details, and can handle several sites in the same estate as one booking.
Common hold-ups
Most delays come from paperwork: no retailer account so no meter, the temporary pole placed where the slab or driveway goes, single phase ordered for a three phase build, or demolition booked before disconnection. We go through each at the start so power is on from day one.
Book site power
Builders across level 2 electrician Quakers Hill, Schofields and Blacktown use us. Call the level 2 electrician Blacktown team to book.
Updated
What good temporary builders supply looks like
Temporary Builders Supply across Blacktown
Temporary Builders Supply in Blacktown: step by step
- Pick the spotWe look at the site and put the supply where trucks, pumps and scaffold won't hit it.
- Sort the paperworkWe lodge with Endeavour Energy and give you the wording for your retailer account.
- Stand it upThe temporary pole or board goes in, gets connected and tested.
- Hand overWhen the new meter board is ready, we connect the home and pull out the site supply.
Related services
Power Disconnection and ReconnectionSafe disconnection and reconnection of the network supply for renovations, demolitions, re-roofing and switchboard work.
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.
Temporary Builders Supply questions in Blacktown
Something else on your mind? Call 0468 449 776 and ask.
We're building in a new estate with a pit at the front. How does site power work?
A site board connects to the pit near your boundary. It's usually simpler than an overhead temporary pole.
Can the granny flat build run from the house?
For small jobs, sometimes. For a full build, a separate temporary supply is safer and keeps the house's circuits free.
Who organises the meter?
You open a retailer account for the site and the retailer arranges the meter. We tell you what to ask for.