Three phase meter board serving a home and granny flat in Blacktown
Level 2 electrical

Three Phase Power Upgrade Blacktown

Enough supply for two households, a shed full of tools and a car on charge, from the Endeavour Energy network.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

Blacktown homes work hard. A main house and a granny flat both running ducted air on a 40-degree afternoon. A pool pump and heat pump. A shed with a welder, compressor and power tools. Solar on the roof, a battery on the wall, and a car plugged in overnight. On a single phase supply, that much load can trip the main switch, overheat the mains, and limit what your solar can export. A three phase power upgrade gives you three phases to share the load.

Who it suits

  • Homes with a granny flat where both dwellings run air conditioning and electric cooking
  • Owners adding a fast EV charger on top of ducted air and a pool
  • Sheds and workshops with welders, compressors or machines built for three phase
  • New two-storey homes designed around big loads
  • Large solar and battery systems where the installer needs three phase

If your real problem is old or small mains, a consumer mains upgrade on single phase may be enough. We’ll tell you which.

The Endeavour Energy application

Three phase starts with a connection application to Endeavour Energy. It confirms that three phase is available at your address and whether the network needs any work first. Most established Blacktown streets have three phase overhead mains, and newer estates in Glenwood, Stanhope Gardens, Kellyville Ridge and Schofields have underground three phase reticulation. Some acreage and rural-residential lines are different and need assessing.

The work

Once approved, we install three phase consumer mains from the point of attachment or pit to the meter board. Your retailer arranges the three phase meter, and your electrician fits the new main switch and protection. On the day we disconnect, connect all three phases, check the balance, test and reconnect. You get a certificate of compliance.

Granny flats and three phase

Most granny flats in Blacktown are fed from the main house. When the flat is big, the cleanest arrangement is often three phase to the main board, with the flat’s sub-board fed from it. We work out the best set-up with your builder and electrician before the flat is connected.

Rebuilds

On a knockdown rebuild, lodge the three phase application early so it’s approved before the house is finished. If the new supply is going underground, the three phase cable goes in with the overhead to underground conversion. Site power comes from a temporary builders supply.

How long it takes

Connection day is one visit. The waiting is in Endeavour’s approval and the meter change, which is why we lodge as early as possible.

Working alongside your electrician

We handle the network side; your electrician handles the switchboard and circuits. We coordinate so the connection happens when the board is ready.

Three phase and solar

Larger solar systems may need three phase to export at the size the installer has designed. If solar is part of the plan, give us the installer’s details and we’ll coordinate the application.

Get a price

Call the level 2 electrician Blacktown team to check your supply and get a fixed written price. Plenty of our three phase jobs are for granny flats in level 2 electrician Kings Langley and Quakers Hill.

Updated

Three phase is priced on Endeavour Energy's requirements for your street, the new mains route, metering and the switchboard work your electrician does. We give a fixed price for the network side after we look.

What good three phase power upgrade looks like

Close-up of three phase power upgrade on a home in the Blacktown area
What three phase power upgrade looks like up close on a typical Blacktown area home.
Signs that three phase power upgrade needs attention
Typical signs that it needs attention.

Three Phase Power Upgrade in Blacktown: step by step

  1. Do the mathsWe add up what you run and plan to run, and check whether three phase is actually needed.
  2. Apply to EndeavourWe lodge the connection application so Endeavour Energy can confirm three phase at your address.
  3. New mains inThree phase mains go in from the bracket or pit to the board; your retailer sorts the meter.
  4. Switch onWe connect all three phases, balance, test and certify.

Three Phase Power Upgrade questions in Blacktown

Something else on your mind? Call 0468 449 776 and ask.

Do we need three phase for a granny flat?

Not always. A modest flat on an upgraded single phase supply can be fine. If both homes have ducted air and electric cooking, three phase is usually the better long-term answer.

My shed has a welder and a big compressor. Will three phase help?

Often. Many larger motors and welders are designed for three phase and run more efficiently on it.

How long does Endeavour take to approve?

It varies with the network work needed in your street. Lodge early, before the equipment is installed.